The TTTP Journal is an international scientific journal published in English language with both electronic and printed versions.
TTTP provides conditions and positive environment for the new idea promotion, exchange research results and achievements accomplished by the scientific community from academia and transportation industry.
Dear Author, please read carefully all texts given on JITA website, especially „Instructions for Authors“. To submit your manuscript please download manuscript template and copyright form. Please attach also a short biography of author(s), max. 200 characters, as a separate MS Word© document. Clicking on „Upload paper“ button will open form to send
In time of rapid economic and technological change and turmoil, no one can manage business successfully, just because they think they are ‘smart’. In order to successfully manage organizations in the era of dramatic change, in this case ŽICG (Railway infrastructure of Montenegro), it is no longer sufficient to master the classical management process, but also to master the overall quality of manage- ment process.
In order to achieve the best possible business results in the Railway Infrastructure of Montenegro, the theoretical and practical knowledge on which the management process is based, starting from planning (goal setting, determining ways to achieve goals, allocating required resources), organizing (a division of labor, delegation of authority, coordination), leadership (supervision, motivation, remuneration and punishment, training), conflict resolution) and lastely control (choice of control parameters, monitoring of results, comparison of planned and realized, taking corrective actions).
In order to improve the current situation, the models of management of railway infrastructure are con- sidered, for which as a manager builds and invests in railway infrastructure, takes care of its moderniza- tion, current maintenance, provides access and allocates infrastructure capacities and organizes and regulates railway traffic. In the processing of the management model, the work relies on the Strategy for the Development of Transport of Montenegro in the period 2019-2035, which establishes the situation in the areas of transport, defines the infrastructure, organizational and operational goals of the devel- opment of the transport system, which are realized through time and long-term implementation plans.
The availability of real-time data on the state of railway facilities and the state-of-the art technologies for data collection and analysis allow transition to the fourth generation maintenance. It is based on the prediction of the facility functional safety and dependability and the risk-oriented facility management. The article describes an approach to assessing the risks of hazardous facility failures using the latest digital data processing methods. The implementation of this approach will help set maintenance objectives and contribute to the efficient use of resources and the reduction of railway facility managers’ expenditures.
In time of rapid economic and technological change and turmoil, no one can manage business successfully, just because they think they are ‘smart’. In order to successfully manage organizations in the era of dramatic change, in this case ŽICG (Railway infrastructure of Montenegro), it is no longer sufficient to master the classical management process, but also to master the overall quality of manage- ment process.
In order to achieve the best possible business results in the Railway Infrastructure of Montenegro, the theoretical and practical knowledge on which the management process is based, starting from planning (goal setting, determining ways to achieve goals, allocating required resources), organizing (a division of labor, delegation of authority, coordination), leadership (supervision, motivation, remuneration and punishment, training), conflict resolution) and lastely control (choice of control parameters, monitoring of results, comparison of planned and realized, taking corrective actions).
In order to improve the current situation, the models of management of railway infrastructure are con- sidered, for which as a manager builds and invests in railway infrastructure, takes care of its moderniza- tion, current maintenance, provides access and allocates infrastructure capacities and organizes and regulates railway traffic. In the processing of the management model, the work relies on the Strategy for the Development of Transport of Montenegro in the period 2019-2035, which establishes the situation in the areas of transport, defines the infrastructure, organizational and operational goals of the devel- opment of the transport system, which are realized through time and long-term implementation plans.
tttp@apeiron-edu.eu
+387 51 247 925
+387 51 247 975
+387 51 247 912
Pan European University APEIRON Banja Luka Journal TTTP Pere Krece 13, P.O.Box 51 78102 Banja Luka, Republic of Srpska Bosnia and Hercegovina
© 2024 Paneuropean University Apeiron All Rights Reserved
jita@apeiron-edu.eu
+387 51 247 925
+387 51 247 975
+387 51 247 912
Pan European University APEIRON Banja Luka Journal JITA Pere Krece 13, P.O.Box 51 78102 Banja Luka, Republic of Srpska Bosnia and Hercegovina
© 2024 Paneuropean University Apeiron All Rights Reserved
Pan European University APEIRON Banja Luka Journal TTTP Pere Krece 13, P.O.Box 51 78102 Banja Luka, Republic of Srpska Bosnia and Hercegovina
tttp@apeiron-edu.eu
+387 51 247 925
+387 51 247 975
+387 51 247 912
© 2024 Paneuropean University Apeiron All Rights Reserved